OSHA and Coatings

OSHA and Coatings

This investigation involved toxic fume issues due to failure to follow safety regulations.  Fumes from a solvent-based sealer installed in an outdoor parking lot entered the building through windows and the ventilation system, causing illness and nausea to the occupants. GZA proved this was due to contractor negligence, in that no precautions were taken to prevent fumes from entering the building, with the sealer installed while the building was occupied.